In the studio, revision C is issued.
The email goes to the distribution list. Whether everyone opened it, the list cannot say.
From studio to site: share the current drawing, inspect the detail and keep the answer with the plan.
The email goes to the distribution list. Whether everyone opened it, the list cannot say.
It is revision B. The drain goes where it no longer belongs.
He was never on the distribution list.
Construction leaders surveyed by FMI, 2018.
Construction Disconnected (FMI, 2018), page 22: 205 of 595 answers. The category covers outdated or otherwise incorrect information, not outdated plans alone. The study surveyed 599 construction leaders: 500 in the US and 99 in Australia, New Zealand, the UK and Canada.
The sample comprised contractors, specialty trades and owners. It was not an architects-only survey, and it does not measure Encloq’s effect.
Attach the revised plan under the same name and it becomes the new version for everyone; earlier ones stay in the history.
Choose Send as new version when Encloq offers it.
How versions workA signed read confirmation shows who has opened the plan. From Encloq One.
See delivery optionsSend a contractor exactly the version they need, or make an earlier one current again.
A large plan should not mean a smaller conversation. Keep the drawing, the revision and the decision together.
Bring the new version into the project conversation. The question can stay right beside it.
A substantial plan set does not have to arrive in full before you begin. For seekable PDFs, Encloq retrieves and decrypts the ranges needed for the page.
The required ranges. Decrypted on your device.
An example set of 200 fictional drawings. In Encloq the viewer retrieves only the byte ranges the page you open needs and decrypts them on your device.Six moments, each where it falls in a project.
Construction drawings · HOAI phase 5
“Structure, services and the builder all need the plans. None of them works in our system.”
One project conversation, invited by email.
Planners and contractors join for free; plan sets up to 250 GiB per file travel the same way.
How invitations workApproval · HOAI phase 5
“Did the client approve this version or the one before?”
A change order needs text form (§ 650b BGB).
Signed on the plan, kept in the history.
The client signs the PDF; the unsigned version stays in the history.
How signing worksTender · HOAI phase 6
“The tender drawings go to every bidder. Who passes them on after that?”
Plans can be protected works (§ 2 UrhG).
Encrypted, and you decide on passing it on.
With Pro, switch off Download and Forward per drawing; copies already sent stay readable.
Award · HOAI phase 7
“The bid comparison goes to the client, with author and company from the template.”
Shared without hidden details.
Author and company are removed on upload; each save in the editor is a version.
Site supervision · HOAI phase 8
“The crack is in the photo, and so is the neighbour’s number plate.”
Marked up and redacted before it goes out.
Redact site photos in the picture editor; location data is removed on upload.
Warranty · five years after acceptance
“Five years on, a leak. Which plan did the plumber work from?”
Planning defects: generally five years (§ 634a BGB).
Every version, with its date and conversation.
The history shows what went to whom and when, and which version was current.
Access control needs Pro. Signatures in Encloq are not qualified electronic signatures. 250 GiB per file, within your plan’s storage. General information, not legal advice.
Unpublished designs are encrypted on the device before upload. Recipients decrypt on their device, including the file ranges needed for a seekable PDF preview.
See how the protection worksNo model federation, clash detection or IFC workflow. Encloq serves the exchange outside your project systems, including a contractor you invite by email for a single drawing.